(Click on Images to Enlarge)
Jun ‘06-Nov ‘07Emergency Beachwalk Construction Bypass Line – C & C of Honolulu
Ala Wai Canal, Inset (Lt) Placing temporary piping, Inset (Rt) Receiving Pit Jacking Pit sheet pile driving Historic Ala Wai Wall settlement monitoring Jacking Pit preparation for microtunneling Jacking Pit piping connection to microtunnel NSLC’s survey (pit and reinforced drilled shafts) matches Frank Coluccio Construction Co.’s survey (microtunnel) Microtunneling Piping and Valve Connections to existing Kaiolu Wastewater Pump Station and Force Main Receiving Pit after pre-stressed plank cover in place Receiving Pit area completed
Department of Wastewater’s response to an emergency discharge of sewage into the Ala Wai Canal.
- Stake the jacking and receiving pits for microtunneling of two four-foot force mains running beneath the Ala Wai Canal from the canal’s mauka side to the Waikiki Kaiolu pump station.
- Monitor settlement markers and report settlement results on:
- the historic Ala Wai Canal wall and
- a 1,600-foot base line established on the Ala Wai Boulevard sidewalk.
- Monitor tiltometers and report settlement results on the Kaiolu wastewater pump station building.
- As-built and map the topography for design of several temporary pumps and 4-foot (1,600 LF) piping along Ala Wai Boulevard sidewalk.
- As-built topography for design of Ala Moana Park pump station force main hookup.
- As-built newly constructed microtunnels and layout piping and valve connections to the existing Kaiolu wastewater pump station and force main.
- As-built newly constructed and connected Kaiolu makai/receiving pit for catwalk platform fabrication.
- Layout the permanent multilevel catwalk in the Kaiolu makai/receiving pit.
- Stake permanent roadway, curbing, sidewalk with ADA pedestrian curb ramps and access door when the Kaiolu makai/receiving pit was sealed.
Feb ‘07-Oct ’07 Niu Valley Sewer Force Main Reconstruction – C & C of Honolulu
Department of Wastewater’s upgrade to their existing system.
- As-built a newly constructed directionally drilled force main.
- As-built the interior features of the three-story underground Niu Valley pump station.
- Analyze and determine the directionally drilled force main and Niu Valley pump station locations for piping and valve connection staking.
- Layout curbing and parking lot improvements.